Synopsis:This programme covers the 3 separate but inter-related systems of the Magnus underwater facilities - the wellheads, the wellhead-to-platform flowlines and the export pipelines.
Shotlist:09:59:51 BP Shield logo, graphics, titles, map showing connections between pipelines.
10:01:39 Process of preparing a pipeline, a construction worker welding a cage, concrete coating, testing a pipeline.
10:04:09 Offshore oil rig, a barge transporting pipelines, joining pipelines process, welding pipeline, laying pipeline in the sea, a submersible being lifted, underwater shot of a submersible inspecting the installed oil pipeline.
10:07:42 External shot of a factory, internal shot assembling parts, a worker using a remote control to operate, GVs inside factory.
10:09:20 Graphics, CU hoses, electrical cables submerged, cable process GVs.
10:11:38 Truck transporting cable drums, installing cables to the platform, transporting cable to a large drum on the barge.
10:12:23 A helicopter lifting off oil rig, people in the control room monitoring, 2 men welding a joint pipeline, graphics, pipe lowered into the sea, workers watching from the barge, testing on the beach, officials discussing, installing a cable into the sand, machine moving slowly, a barge continuing work offshore, under water shots of cable installation and pipeline, aerial shot of oil platform.
10:18:28 People in the control room, aerial shot of oil rig.
10:18:51 Title
10:18:57 BP shield
10:19:00 End