The Sullom Voe Project (1982) and The Village Fields (1988)
The Sullom Voe Project (1982) and The Village Fields (1988)
Record options
- Release Date: 1st January 1982
- Asset ID: 800703
- Synopsis: Two programmes on BPs operations in The Village Fields - 1988 and Sullom Voe Project - 1982.
- Shotlist: 10:00:02 BP shield logo 10:00:07 Titles 10:00:24 Pan R to L across field to Humberside coastline, MCU warning sign, pan L to R across village to road effected by coastal erosion. 10:00:47 Aerial shot over Humberside coastline. 10:00:57 Map of Humber. 10:01:22 MWS Sunset view from Holderness coastline across the sea. 10:01:33 Aerial shot of tug boats towing a platform, CU rotating drilling bit, MS man standing and operating the drilling bit, aerial shot of coastline, GVs gas pipeline installation process, aerial shot of BP's West Sole field and Easington terminal. 10:02:05 Graphical map showing Humberside coastline and the Village fields. 10:03:13 Pan R to L across the Dimlington gas terminal construction site, GVs construction and building process of the Dimlington gas terminal. 10:03:58 Graphics 10:04:18 LS docked fishing boats, pan L to R fishing boat sailing through harbour. 10:04:28 LA pan the construction work on the Cleeton jacket and deck wellhead tower, LS building work on the wellhead tower, LS Cleeton jacket finished and ready to be towed at the port. 10:04:42 MLS man welding, MCU welder at work, GVs various preparation works at the port. 10:04:53 GVs construction work on the Dimlington pipeline trench, pan R to L pipeline trench through the shore at Dimlington. 10:05:21 LS pipeline lay barge towed by a tug boat of the beach, LS men welding pipeline on the barge, GVs pipeline welding and preparation process, HA from the barge laying pipeline on the seabed, LS pipeline lay barge working offshore, LS crane at a construction site and a pipeline being winched to shore at Dimlington, HA men welding the pipeline connecting the offshore to the land section. 10:06:03 Pan R to L across the shore and construction work carried out to bury the pipeline. 10:06:15 GVs construction and planting work to strengthen the soil. 10:06:43 Pan L to R tug boat towing the Cleeton wellhead tower to the Village field, pan over the jacket, GVs a barge placing the jacket on the seabed, GVs construction work to fix the jacket on the seabed, GVs placing the topside on the jacket, GVs of Cleeton well, GVs drilling process at Cleeton well. 10:08:10 MWS onshore construction work on the gas terminal, MWS GVs trucks transporting big loads through narrow streets, GVs assembling and construction work on the Dimlington gas terminal. 10:08:44 Graphics showing drilling wells, pan R to L harbour to construction site at Wallsend Tyne bank, GVs men working on the production part of Cleeton's platform. 10:08:52 Pan GVs men working on construction of the quarter's module near Middlesborough. 10:09:57 HA pan L to R construction work carried out on the three top sides of Ravenspurn South wellheads at the Tyne bank early 1988, LA MWS of the Ravenspurn South wellheads at the Tyne bank. 10:10:14 LS construction work on the three jackets near Inverness, LS GVs cranes working slowly to put the jacket into upright position, MWS works and preparation on the three jackets. 10:10:37 GVs transporting the production module deck for Cleeton's platform to a barge. 10:11:03 MWS man passing by and a jacket in the BG at Stornoway port, GVs transporting the jacket into a waiting barge. 10:11:46 HA the production deck loaded onto a barge at Tyne bank. 1011:50 HA the accommodation module standing on a barge at Tee's harbour, LS the accommodation module. 10:11:59 Aerial shot pan GVs of Cleeton's wellhead tower and a crane barge, LS the jacket towed towards the wellhead tower, aerial shot tug boat towing the jacket across the sea towards Cleeton's platform, MLS the jacket slowly moving towards the wellhead tower, MWS men standing on the crane barge watching the jacket and wellhead tower in the BG. 10:12:48 GVs crane barge and work process of placing the jacket at Cleeton's wellhead. 10:13:52 Travelling shot pan R to L across the Tyne and the towing process of Cleeton's production deck. 10:13:57 GVs of the waiting crane barge at Cleeton during fog. 10:14:20 GVs lifting and installation process of the production deck at Cleeton's platform. 10:16:05 GVs installation process of the Ravenspurn South wellheads. 10:17:14 GVs installation process of the Ravenspurn South topsides, GVs of the Ravenspurn South wells. 10:17:53 LA drilling process and the rotating bit, CU rotating drilling bit, travelling shot pan R to L across Cleeton's platform and wellhead with a accommodation barge in the BG. 10:18:15 GVs of people working on the installation and finishing process of Cleeton's platform. 10:18:38 MWS pan across quarter's module and a man in his room, GVs people eating at the platform's restaurant. 10:18:50 Aerial shot pan over Cleeton's platform and wellhead, aerial shot across the sea to the shore and over to Dimlington's terminal, GVs Dimlington gas terminal. 10:19:44 LA MWS Dimlington's control and command centre, MWS GVs people working at Dimlington's control room, CA GVs Dimlington gas terminal. 10:20:45 Aerial shot pan across Cleeton's platform. 10:21:20 BP shield logo 10:21:23 END 10:21:24 Graphics, map of the North Sea and the Shetland Islands. 10:21:51 LS strong waves hitting the shore, MWS GVs waves hitting the coastline, MCU man working on oil research in a lab. 10:22:15 Graphics of the Sullom Voe Project near the Shetland Islands. 10:22:39 GVs of Shetland Islanders, CU agreement document. 10:23:09 MWS GVs Shetland coastline, GVs scientists collecting data and samples of marine life on the shore, 2S men working on a boat and lowering equipment to monitor current speed, MS using equipment to check underwater current speed. 10:23:47 LS a barge working close to the shore installing pipeline on the seabed, GVs of pipeline installation process on the sea bed. 10:23:56 MWS pulling pipeline to the shore and a barge in the BG, MS man standing next to a small drilling machine, LS zooming out men welding pipelines in a trench, GVs men welding pipeline. 10:24:20 Aerial shot pan across the terminal, GVs construction work on the new terminal site. 10:25:20 Travelling shot pan across tanker docked at Sullom Voe terminal, aerial shot GVs of the terminal. 10:25:44 LA MWS pipelines and the terminal, GVs of the terminal, MS men working at the control centre, GVs of control room. 10:26:11Travelling shot across the terminal, GVs of the terminal, LS terminal pipeline and storage facilities in the BG. 10:26:31 Aerial shot pan over the terminal and storage facilities, GVs of the terminal. 10:27:15 MS pan R to L man walking and monitoring inside the power station control room, GVs power station control room and engine room. 10:27:45 MS of the terminal, GVs of the terminal. 10:28:07 MWS terminal and water in the FG. 10:28:11 Aerial shot over terminal harbour, aerial shot pan across terminal and its harbour, travelling shot across terminal harbour and docked vessels. 10:28:55 MLS terminal and storage tanks in the BG, GVs terminal. 10:29:12 MS coastline and terminal in the BG. 10:29:22 Aerial shot pan GVs over Sullom Voe. 10:29:37 LS a boat sailing across and Sullom Voe in the BG, travelling shot Sullom Voe, aerial shot over Sullom Voe. 10:30:09 BP shield logo 10:30:16 END
- Production Company: None
- Licensing Restrictions: None
- Viewing Restrictions: Public
- Format: BetaSP_Large
- Alternative Language Notes: None